We are thrilled to announce that the much-anticipated road construction at Camp Wawona has begun! Our commitment to improving our facilities and ensuring the safety and enjoyment of all who visit is stronger than ever.
Here’s a glimpse of the progress:
Infrastructure Upgrade: A massive overhaul is taking place across the camp to enhance our infrastructure, ensuring a robust foundation for our future developments.
New Turnaround Point: Near the swimming pool at the top of the hill, we are crafting a new turnaround space, designed for ease of access and safety.
Road Expansion: A before-and-after perspective reveals our transition from the narrow 9-foot road to a spacious 22-foot thoroughfare. The new road is being constructed to the right of the old one, with an elevated design to mitigate steepness, making travel smoother and safer for everyone.
The accompanying images were captured right before reaching the pool area, showing where the old meets the new, as we carve out a path that will serve our community better.
Our Plan:
The project is on track to have the road prepared for the winter season, with the aim of completing all construction work in April and May 2024. This means by the time summer rolls around, and camp is in full swing, we will have a fully functional, improved road ready for our campers and staff.
Keep an eye on our website for further updates as we continue to pave the way to an enhanced Camp Wawona experience! 🌟
If you have any questions, please feel free to contact Jackie Phillips, Capital Campaign Director at 559-217-1031.
Comments